Hello QM gurus,
I am trying to implement time based inspection. I can see the reference parameters(time-based, qty-based etc) in master recipe in operation details screen but I don't see the reference parameters in Inspection plan detail screen. I have maintained the 150 - time/qty based inspection points in the header and used QM01 as control key. Please let me know if I am missing something.
Thanks in advance.
Mithun.