I want to save a Broadcasting-Object (e.g. a query with given variables using e-mail).

Before I can schedule the job, I have to save my settings.Whenever I try this, it's telling me that the system is not changable and I need to open it by using SCC4 or SE06.

It's our Production System, therefore I don't want to open it generally, but I certainly can open the object(s) which would allow me to save my Broadcasting settings..

Would anyone of you know, what I have to open. ?

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Have you tried changing the BEx Changeability settings for Broadcasting objects in the Transport Connector?

RSA1 -> Transport Connection -> Object Changeability -> BRSE (Broadcast Setting)

If you change this to be changeable you should be able to save new Broadcast Schedules.