Hi all,

i am doing SOP for material A, so i use MC88 to enter the sales plan for 3 month, December-January- February,

then i enter the opening stock level for this SOP, after that i create the product plan using TARGET STOCK LEVEL, so for the first month, there are no production plan because the stock are available, but for the second and the third month, the production plan exist because the stock level is empty

Now, after that, i run the transfer to Demand management using MC74 for that material, so the material now has transferred to Demand Management becoming PIR

Then i check to MD04 Stock rqmnt list to see the Indreq, and i check that the current stock is different from the opening stock level that i entered previously in opening stock level

so, i want to ask is there any correlation between the opening stock level that i entered in SOP with the current stock in MD04?

should i entered the value for the opening stock level the same with the current stock in MD04?

if in MD04 there are already the value for current stock, then what is the function of the opening stock level entry in SOP? isn't it better not to entry the value for opening stock level, because the stock already entered in MD04?

regards,

MARUFAT