Hi
Im using message branching by passing the 2 different PO numbers to two different idocs
For this im using two mapping programs and obviously 2 interfacing mappings. Now when im running the scenario both the mappings are taking the first PO number only.. the second PO number is being discarded..
In the MM test tab both the mappings are successful with different PO number. But at runtime during message branching the second PO is being discarded.. I've checked "Maintain Order at runtime" in Interface determination too
But no use .. did i miss anythig
-keerthi