Hello Gurus,
I have a cenario in SNP-CTM that I'd like to use 2 PPMs to produce the same products (2 different ways). Besides, something we can use both line to produce it however limiting the capacity as it was only one line (the line is not dedicated to only this product).
I intend to use quotization in order to determine for example: 70% in line 1 and 30% in line 2, however I coudn't reach that, the CTM product in only one PPM.
I'd like to know if it is possible in CTM cenario, use the quotization in order to use 2 PPM to produce one product. If so, is there a tip to provide that?
Could you help me?
Thanks and regards.
Marcos.