Hi All,
I have maintained the palletization data in material master as given below
LE quantity Un SUT
2500 pc E1
200 pc L4
100 pc L3
Now when I have 201 pcs and above system picks SUT E1 and when I have 101 pcs and above system picks SUT L4. This is working fine.
But when I have 100 pcs and less the system does not pick SUT L3 as required. It still picks L4.
Is this standard or are we missing something here?
Regards,
V S