MRP areas and MRP controller..

Former Member
0 Kudos

In a plant if there are some 100 x materials and 100 y materials..

The requirement is when the 100x materials are planned ,The 100 y materials should not be planned(i e 100 y materials should not be considered in planning). How to map this in MRP.

I have heard that using MRP controllers or MRP areas this can be achieved.But I don know how?

If anybody cud help me in how to proceed this?

Accepted Solutions (1)

Accepted Solutions (1)

former_member184655
Active Contributor
0 Kudos

Dear Anujah,

Assuming you have created 2 different MRP controller say M01,M02 and M01 is assigned in the material master of X and M02 is

assigned in the material master of Y,then while executing MRP at plant level you can activate user exit M61X0001 in order to

restrict the MRP run based on MRP controller.

Regards

Mangalraj.S

Answers (2)

Answers (2)

former_member311826
Active Contributor
0 Kudos

Hi Anujah,

You can achive this through MRP area. Do the following customization settings

1. Activate MRP for MRP area.

2. Defien MRP Area for sto loc. Say your X matrerial are at sto loc X0001

3. Define scope of planning for total panning run. Here enter your MRP area.

Now Go to MD01.

In scope of planning enter plng scope define for materail X & run MRP. It will only run MRP for material having sto loc X0001.

Regards

Abhijit Gautam

Anupam1143
Active Contributor
0 Kudos

HI

This can be achieved through the user exit in MD01 based on MRP controller assing different MRP controller for X and Y material and with the help of ABAP you can use exit in MD01 and run mrp with that exit in MD01

sorry the user exit which is used in my scenario which is same as of yours is M61X0001 as Suggeste by Mr Mangalraj

Regards

Anupam Sharma