cancel
Showing results for 
Search instead for 
Did you mean: 

GR Sto location for Prod order and GI sto location for another prod order

Former Member
0 Kudos

Hi ,

Material A is produced inhouse as well consumed by other plant for their production Order .

Plants - -1000 ,1200

Material A is produced in 1000 , Production order GR location is 0001(in MRP 2 view -Issue st location )

In plant 1200 material A is used as raw material , by using the spl procurement key withdrawl from from alternative plant ,material A directly consumed for the production order of plant 1200 ,for this order i want get the material from the sto location of 0002 of the plant 1000 .What are the settings to be made to meet this requirement ...

Best Regards,

Kumar

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

U need not go for any settings.. Just Specify the prod storage location in MRP2 view..

In the case the material produced in-house, this is the key of the storage location that is copied to the planned order, production order, or run schedule quantity.

If the material is a component, it is the issuing storage location to which a backflush is posted.

If the material is produced, it is the receiving storage location to which the receipt of the material is posted.

So in plant 1000,keep the Prod stor location for the material as 0001

in 1200 keep the same as 0002..

this stor location is not only the prod stor location for inhouse materials but also the issue stor loc for procured materials

former_member311826
Active Contributor
0 Kudos

Hie Kumar

You need to change the storage location of 1200 Plant material to 0002. You material for plant 1000 will get stored in 0001 location. At the time of issuing the you need to do storage loc to storage loc transfer in 1000 plant i. 0001 to 0002 , so that the stock will find at 0002 when the matrial is required for plant 1200

Regards

Abhijit Gautam

Former Member
0 Kudos

Dear Abhijit Gautam and Karthik ,

i hope you both mis understood the scenario.

Material A -


> Produced inhose in plant 1000

Used as a raw material in plant 1200 .

In plant 1000 - - - > Material A production order GR location is 0001 , And I want to issue the material to production order of the Plant 1200(using the spl procurement key withdrawl from alternative plant ) from the storage location 0002 .*

*In the MRP 2 view if i put 0001 when i create the Production order in plant 1000 GR location copied as 0001 , and when i create the producion order in plant 1200 the issue location for the material is copied as 0001 (here i want the storage location 0002 , i do not want to change the sto location manually in the 1200 plant production order )** How to make settings or need to use any exits ....

I am expecting some replies.........

former_member196398
Active Contributor
0 Kudos

>

> Dear Abhijit Gautam and Karthik ,

> i hope you both mis understood the scenario.

>

> Material A -


> Produced inhose in plant 1000

>

> Used as a raw material in plant 1200 .

>

> In plant 1000 - - - > Material A production order GR location is 0001 , And I want to issue the material to production order of the Plant 1200(using the spl procurement key withdrawl from alternative plant ) from the storage location 0002 .*

>

> *In the MRP 2 view if i put 0001 when i create the Production order in plant 1000 GR location copied as 0001 , and when i create the producion order in plant 1200 the issue location for the material is copied as 0001 (here i want the storage location 0002 , i do not want to change the sto location manually in the 1200 plant production order )** How to make settings or need to use any exits ....

>

> I am expecting some replies.........

Kumar,

There is no need for any user exit, you can achieve this by defining in the BOM- Item details where material A is used as raw material in Plant 1200.

Please maintain Prod. storage location as "0002" in the Status/Lngtext tab in the BOM Item level details for component A in the BOM where ever it is used in plant 1200.

With this defination along with special procurement key for withdraw from plant 1000, when you are performing backflush in plant 1200, system would derive plant as 1000 and storage location as 0002 for component A.

Regards,

Prasobh

Former Member
0 Kudos

very simply you can change the stor loc for the material in the second plant ..Just like extending...

[http://forums.sdn.sap.com/click.jspa?searchID=34934174&messageID=8192102]

Answers (0)