on 11-25-2009 7:14 PM
System : SRM 5.0 / ECS.
I have done all the required Spro Configuration.
Issue: Priority (High , Very High , Low etc ) in Sourcing Cockpit are not displayed for SC that are assigned to Contracts .
The SC that are not assigned to contracts we can see these priority (High , Very High , Low etc ).
Any thoughts.
Problem solved.