Hi dears,
I'm trying to put in place batch splitting process. When in QA11 transaction - Inspection lot stock screen, I enter a quantity in field "To new material" and I assign a new batch number, I would like to have the new batch created in QUALITY inspection stock type & an inspection lot created for this new batch.
This can be partially done through movement 323; however, this movement has no inspection lot origin assigned so no inspection lot is generated.
So I created a custom movement by copy, and assigned to it the origin '08'. However, inspection lot is still not created.
IF I assign origin 08 to the standard 323 AND I use in QA11 my custom movement, it works.
Does anyone know why the system keep this kind of dependency between original movement and custom one?
Thanks a lot,
Giovanni