cancel
Showing results for 
Search instead for 
Did you mean: 

Backflush - storage location

Former Member
0 Kudos

Hi guys,

I have a material in two storage location of the same plant.

While confirmation of the process order, i need the automatic goods movement to happen in one st.lcn.

and the other has to be done manually. Is this possible if so, how?

Regards,

Jish.

Accepted Solutions (0)

Answers (6)

Answers (6)

Former Member
0 Kudos

Thank you guys, thanks a lot.

That issue is closed.

Regards,

Jish

Former Member
0 Kudos

Thank you guys for the valuable tips.

I do have one more doubt, can i restrict the automatic goods movement in the other st.locn and

whether it is possible to do the goods movement manually by doing migo against process order?

Regards,

Jish.

Former Member
0 Kudos

Hi

Maintain the production storage location in BOM under item tab in issue storage location, while confirmation goods movement will happen from this storage location.

Regards

Kishore

Former Member
0 Kudos

Hi,

To activate Blackflush u have three stages,

1) Material Master MRP 2 View Where u have got 2 options 1) always Blackflush 2) workcenter decide Blackflush

after that you give Production Storage location in MRP Work Scheduling View.

in these above said two options if u select 2nd Option u have to activate Blackflush in Workcenter.

OR

2) You can find Blackflush in BOM clcik on Material Component, you can find a screen like Basic data, Status Long text, etc.

Goto Status / Long text u will find Production storage loctaion under Further Data give the storage loctaion from whre u want to

issue the material.

For both above Points to activate blackflush you have to assign the material in Routing to Blackflush

steps.

Slect the Operation in Routing click on Comp Allocation , U will find Materail component,

Select these material component click on New Assignment slect Workcenter enter,

Now you will find check box for this component , Pls check it.

Now in Cofiramtion Goods movement screen u will find the Material component with sloc.

Pls Check it,

Regards,

Pavan

Former Member
0 Kudos

Hi Jish,

another possibility is the determination of the required storage location via automatic stock determination during process order confirmation.

Last but not least, another possibility is using BAdI WORKORDER_GOODSMVT, method BACKFLUSH. Here you may develop an own logic in order to assign the correct storage location.

Regards, Andreas

Former Member
0 Kudos

Dear Jish,

Very much possible

in MRP -2 view there is field Prod. stor. locattion

here which you want to maintain default, maintain it

and second storage location if you want to change

then change in confirmation screen

Regards

Madhu

Anupam1143
Active Contributor
0 Kudos

Hi

Maintain the production storage location in work scheduling or in BOM under item tab in issue storage location,

maintain either of the two places. and also if want to restrict the user to use the storage location then use the BAdi WORKORDER_GOODSMVT or RM_BFLUSH_GOODSMVT with the help of ABAPer.

system will pick the issue storage location maintained in BOM first then from work scheduling,

Check and revert

Regards

Anupam Sharma