dear all
while making pr for materials,by t-code me51n, the system does not make the material short text diable/grade out.
eg if i select material from material master say material code 1000055-----& short text is --cement 53 grade.
then at the time of creating pr i can change the short text cement 53 grade to any off my choice.
logically this should not happend, as then their will not be any trace of PR in system.
pls let me know how to come out of this problems.
as we want that when ever we select the material from MM master, the system should make the short text grade out while creating the PR, so that further complication can be avoided.
thanks in adv
regards
pairkshit