Automatic creation planned order according to raw material stock level

166 Views

Hello All,
I have a case that the a production order (X) of a semi-finished product (A) also produces a by-product (B) which is accumulated in a storage location, this by-product (B) is re-processed by a production order (Y) to produce the raw material of production order (X).
But in this case the production order (Y) should occur ONLY IF the stock level of the by-product (B) reaches a certain quantity (lets say 100 kg).

How could i automate the creation of a planned order in MRP if the stock value of a raw material reaches 100 kg ?