Skip to Content
A K

Dismantle and Install to new Maintenance Plant

We are new to PM and want to understand how to transfer an equipment from one functional location to another functional location with a different maintenance plant.

I see it is possible to dismantle the equipment (IE02), change the maintenance plant, and then install in new functional location but is there a more orderly way? Is there an order type which adds structure to this process? How is the equipment categories when in shipping if the process I described is used?

We do not intend to use all the functionality of PM and so capturing cost is not required. (Just keeping it very simple.)

Thanks in advance,

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

2 Answers

  • Nov 07, 2018 at 10:51 PM

    See in a sandbox-environment if Trx."CC04" could serve your need. This Transaction could be set-up (through Filters and Personal Settings) to allow a Drag-And-Drop Re-allocation of Equipments, even Cross-Plants. However it needs some thourough Testing so you can see what data is updated. This is not something to do in a trivial manner in a PROD-System.

    If not applicable, LSMW for "IE02" could do the Trick, or a Custom Program using BAPI's, but that would require Technical / ABAP-Skills.

    Add comment
    10|10000 characters needed characters exceeded

  • Mar 26 at 08:37 PM

    Thanks for your input.

    Add comment
    10|10000 characters needed characters exceeded