Dears ,
doing the unicode conversion during the final preparation steps we are asked to create the unicode nametab on the source system not unicode..
I always did this action with no user logged on, also the Sap guide do not says anything about that.
In you opinion is possible to use in production operation a Non unicode system where final preparation steps have been performed (and so the unicode nametab have been created ) ?
Regards