Skip to Content
author's profile photo Former Member
Former Member

Problem with Plant for component tab in Work Order

Hello everyone,

When I load a material in the order components tab the "Plant" column is filled with the planning plant. Is it a standard behavior? I need to load a material from a different plant to the planning plant so I need to be able to force that plant or deactivate the automatic load. It's possible?

I need material for plant PT01 and planing plant PM01.

Thanks very much

cmp1.jpg (53.2 kB)
cmp2.jpg (99.0 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Nov 23, 2016 at 04:09 AM

    Hi,

    Normally it should be an editable field. It may be due to some custom enhancement to grey out the plant in the maintenance order.

    Ask you developer to check it

    Regards

    Terence

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 23, 2016 at 07:28 AM

    Claudio,

    This could be a customer development possibly via user-exit CNEX0027 (Customer enhancement: Plant, storage loc. finding for comp.), or it could be some MM customising on the materials master,or a combination of both..

    So talk to your ABAP and MM teams.

    PeteA

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.