on 11-23-2009 8:23 AM
Hi All,
I have created a NB type stock transport order. Now I want to create an outbound delivery against it. But when I go to Txn VL10B I get an error as
No schedule lines due for delivery up to the selected date
Detail
Diagnosis
There are no schedule lines due for the given order item up
to the date chosen.
System Response
The system does not create a delivery item for this order
item.
Procedure
o Check whether the order item to be delivered contains
confirmed schedule lines.
If this is the case, set the selection date further into
the future if you still want to create a delivery for this
item.
Could someone plz let me knwo what am I missing?
Regards,
V S
this was related to replication of the order and material in APO...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Check whether the route and the loading group are maintained in the shipping tab view in the PO. If not maintain a route. Also maintain the proper loading group in the material master for the supplying and demanding plants
Regards,
Ashwin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Please check wheather the PO is with already delivered with a document.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Enter a wider date range in VL10B.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
For STO's you should use document type "UB" and not "NB". Try with "UB"
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Ist STO between plants, within same company code? if yes, then you have to use doc type:UB to create STO in ME21N.
if STO between Plant between 2 different company codes, then you can go for NB doc type.
- Check in ME22n, for this STO- Item level whether Shipping tab is triggered or not? Shipping Point has to be determined in this shipping tab to create Outbound delivery in VL10B.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Check in the PO, the delivery date and in VL10B u need to enter delivery creation date.
check that both should be same
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello ,
check the shipping tab in PO
Check whether the the PO document is released or not
Vengaladasu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Error is pointing the Sales order schedule line.
Please check whether you got the shipping tab in the PO.
Thanks/karthik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.