on 11-21-2009 10:15 AM
Experts
I want the measurement document to be updated automatically when a production order is confirmed.
I tried this by creating an equipment as a PRT attaching measurement point (counter) to it and a plan. The measurement document was updated when i confirm my production order. But this process was in Discreet Manufacturing.
When I tried to do the same in REM process, measurement documents are not updated.
Any suggestions ?
Venkat.
What is REM process?
Narasimhan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
REM Process with PRT
Description T-Code
Create an Equipment as a PRT IE25
Create a measurement point as a counter IK01
Attach a task list to the equipment IA01
"Create a maintenance plan
(In plan attach the equipment,task list,cycles/unit)" IP41
"Attach the maintenanace plan to the created
equipment in the PRT tab" IE02
Attach the PRT equipment in routing CA02
REM Backflush MFBF
"The backflush quantity is not getting updated
in the measurement document"
Regards
Venkat