Hi,
I am using a PO release strategy wherein there are 4 levels of release; R1,R2,R3,R4 (these are release codes).
The release code R3 has the right that if (s)he releases, the release is activated.
I have configured this but the problem is that in ME23N/ME29N, the codes are displayed in the following sequence as below:
R1
R3
R2
R4
Though the actual sequence is R1,R2,R3,R4.
What system is doing that all such codes which have this right are displayed just below the 1st release code.
This will cause a confusion among the users during PO release.
Kindly suggest, is any way out to amintain the display as per the sequence.
Thanks