Hi all,

Please help me to resolve this issue,

I am using material specification & inspection plan for the result recording purpose and my MIC's are linked with characteristic.

When i am using material specification for result recording i am able to valuate the characteristic automatically.but when i am using the inspection plan for result recording, the characteristics not get valuated automatically.

I am using same sampling procedure for inspection plan as used for mateerial specification where its valuating the characteristic automatically.

I want to valuate the characteristic automatically for Inspection plan also.

Thanks & regards

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

Is your MIC's in the task list are "Optional char"??

What you can do is use same MIC & same sampling prcedure in both & check.

If it works same then problem is with the MIC's in the task list

Regards

Sujit

Former Member
0 Kudos

Hi Sujit,

Thanks for qucik reply,

I will explain the all the scenario,

We are having MIC's linked with characteristics so all the MIC's are reference.

For all MIC we have the setting of sampling procedure & required characteristic, so characteristics are not Optional.

For some materials i using material specification for result recording & for that i am getting automatic valuation.

Now i am using the same MIC's for inspection plan only difference is that the upper limits & lower limits are different so while using these MIC's in the inspection plan i am changing these limits only and other setting are as it is like sampling procedure required characteristic also i am using same sampling procedure which i am using for material specification but still i am not able to valute the characteristic the automatically which i can for material specification.

In all the difference for the MIC is that i am changing the limits only for Inspection plan all other things are as it is

Thnaks & regards

Former Member
0 Kudos

Please check in REsults Recording Tab in Plant Level Settings...there you need to select Automatic Close option...