Hi everyone:
I need to get a several levels into my material structure using the Variant Configuration for the FERT as well with the HALB.
I need to set up my FERT since the Sales Order, but, the lower level, I mean the HALB, needs too be configurated, but not in the Sales Order, but rather this task should be made into the Planing Department.
So my doubts:
What Strategy group I need to use for both levels [Fert & Halb] into my MRP3 view?
Anyone have study material about this req?
Thanks in advance
OP