takt based scheduling -reg

Former Member
0 Kudos

Hi,

Any material stuff on takt based scheduling ?

In SAP help i could not find

Earliest reply is highly appreciated

regards,

madhu Kiran

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

answered

former_member184666
Active Contributor
0 Kudos
Former Member
0 Kudos

Dear Madhu,

takt based scheduling

1) Basically this will be calculated time taken for total Production line

2) Normally this will be used in KANBAN system ( Bin system )

3) Materials will be directly staged to production line in Kanban system

4) so almost all zero inventory cost for raw materials in Kanban system

Regards

Madhu Kumar