Dear all experts,
please help me on the following issue.
i assign a material to an activity, release the project and run mrp, i get the PR for the material.
i need the PR document type be ZPR, not the standard NB.
i enter ZPR in OPTT, but it doesn't work.
do i need to do anything else?
can i set the material PR type to be ZPR?
thanks a lot.
Judy