Skip to Content
0
Former Member
Nov 16, 2009 at 04:21 PM

Material staging via delivery

533 Views

Hi All,

I am trying to configure the WM/PP interface so that as soon as I release the production order it creates an oubound delivery (not a T.R.) for raw materials. I have configured the following steps:

- I have created a production supply area for the material

- Created control cycle for the material

- Under OMK0:Define control Data- General: I have put the plant, production supply area, staging indicator"1", Checked the delivery box, put delivery Type WMPP and assign a ship to party

- Under OPKP(production scheduling profile), I have selected creation of TR/TO on order release, checked GI via delivery

- Activated the PP interface under OMK0

- I have assigned a replenishment Mvt type to the material staging storage type

However, when I create and release the order, I have the following message:

"Error during read of sales org., shipping pnt, distr.channel or division", "Essential transfer parameters are missing in record: 000001"

Thanks