Skip to Content
0
Former Member
Nov 16, 2009 at 12:06 PM

manual Accrual Engine (T-code acatree02)

265 Views

Hi,

for the accrual object we need to request:

- is it possible to configured two or three cost center for one accrual object (to split with percentage rate or amount)

- is it possible to write a different text (field bseg-sgtxt) in to the document. We need for every accrual object a different text in the document.

Thank you and best regards,

Chrigu