Reg. System status of Plant maintainance work order.

Hi All,

I have a req. where we need to fetch all the PM orders on some conditions and calculate planned and actual costs.

I want to know what is the system status when costs are supposed to exist.

thanks.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 14, 2009 at 09:32 AM

    Hi,

    As you are aware there are two types of costs.

    1 planned Cost this will get updated irrespective of your order system status. As soon as you maintain Material or Opertion with activity type.

    Even if you select exterenal cantrol key in operation, what ever you give the cost while filling the data for PR generation will pick up for planned cost. Simillarly for material PR too.

    2. Actual cost this wil get update when you post the material or confirm the operations. You can post material provided your order system status is REL released That means you can say actual cost posting will happen provided order is released.

    Hope it's help ful.

    Reg,

    N.Nagaraju

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi,

      By mentioning the required components in maintenace order component tab we are adding material to maintenance order.

      The estimatted cost will help you to estimate the cost at different value categories. May be you can set certain limit of amount against which you want to check the cost staus. But it has got no control to check like budget. And this estimatted cost will go in to disply mode once you release the order.

      Reg,

      N.Nagaraju

  • author's profile photo Former Member
    Former Member
    Posted on Nov 14, 2009 at 09:35 AM

    Hi,

    PRC pre costed is the status when costs are updared.

    Reg,

    N.Nagaraju

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.