Hi ,
I am currently looking to implement RAR version 5.3 SP9. I will have a 2 tier landscape with a DEV and PRD GRC instance. We may not have the ruleset fully customised before we build PRD GRC. So after both RAR environments are built I may need to change the ruleset in DEV and then upload the changes to PRD. Is this possible in 5.3. Can I easily download the ruleset from DEV and import to PRD as many times as I want? Or do I need to delete the PRD ruleset each time and recreate it?
Thanks,
Gary