Skip to Content
author's profile photo Former Member
Former Member

Mismatch in GR value

GR is happening @ some wrong value other than the price mentioned in the PO. During First GR, it was correct and during subsequent cancellation and GR the values r wrong.

1. PO Details:

Mat A Qty : 2, Net Price : 200 USD / piece

2. GR (MIGO)

Mat A Qty 1 , date: 10/11/2008, GR Value : 200 USD -


Correct

3. Cancel GR (MBST)

Mat A Qty 1 date: 03/12/2008 GR Value : 195 USD----


Incorrect

4. GR (MIGO)

Mat A Qty 1 , date: 10/02/2009, GR Value : 197 USD -


INCorrect

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 13, 2009 at 06:15 AM

    Hello Praveen,

    It may be because the price control indicator in the material master of the material whose transaction you are doing has been set to V (moving average price). So, at the time of MBST; its taking the current (on the date of doing the transaction) valuation of the material.

    Regards,

    Chiranjib

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Praveen,

      This may probably not affect the situation. Please check your price history in material master to see the prices & price control indiactor of that material on the date you did the transactions mentioned by you in your first post in this thread. You have mentioned that price control indicator is "S" & price is 0.00-- I think this is the current data. So, you need to check these data for your transaction date by going to "material price analysis" in accounting1 view- here you will get the data period-wise.

      Alternatively, you can see the changes made to the material master by: MM03->Environment->Display Changes.

      You may look out for any changes made to price control indicator & the valuation of the material between today and your transaction dates.

      Regards,

      Chiranjib

      Edited by: Chiranjib Banerjee on Nov 13, 2009 8:07 AM

  • author's profile photo Former Member
    Former Member
    Posted on Nov 13, 2009 at 06:17 AM

    Hi,

    Please check the Material Master Accounting Data What is the Price maintained over there as well Check is there any previous GR/Invoice happen with Less value in ...

    You Can use MR21 for your references.

    try at your end.

    regards,

    Ninad

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 13, 2009 at 06:18 AM

    HI

    Check the material master accounting view 1

    Check the price control, S or V

    If V, it is moving average price control. Then it will take the moving average price from material master.

    Check this out.

    Thanks

    Raman

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 13, 2009 at 06:26 AM

    Dear,

    1. PO Details:

    Mat A Qty : 2, Net Price : 200 USD / piece

    Check the price in MMR when you created PO.

    2. GR (MIGO)

    Mat A Qty 1 , date: 10/11/2008, GR Value : 200 USD -


    Correct

    Check the price in MMR when you created GRN.

    3. Cancel GR (MBST)

    Mat A Qty 1 date: 03/12/2008 GR Value : 195 USD----


    Incorrect

    Check the price in MMR when you Cancelled GRN as per document date.

    4. GR (MIGO)

    Mat A Qty 1 , date: 10/02/2009, GR Value : 197 USD -


    INCorrect

    Check the price in MMR when you did GRN as per document date.

    This happened due to price change in MMR, Moving average price keeps on changing.

    Regards

    Utsav

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.