CHaRM-Handling old transport request before CHARM was activated.

Hi All,

Recently i just activated CHARM in solman-SM1 for new a project implementation. This CHARM was setup in in such a way that it tie to one of the local IMG project EPROJ in developmemnt-DEV. Now i have one concern and that is those transport requests where created before i activated CHARM.

These old transport requests were crerated directly in DEV without project assigned. Therefore, we tried to assign IMG project EPROJ (the same IMG project setup in CHARM) into those old transport request manually.

Problem : When i tried to perform released step in CHARM tasklist it says that "No transport request found"

Question : How do i make CHARM to pickup those old transport requests?

Really appreciate your feedback as there are a lots of old transport request which needed.

Thank you.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Nov 12, 2009 at 12:25 AM

    Hi,

    Please check to which CTS Project the transport requests are assigned

    and then you could change the CTS Status Switch for the specific CTS

    Project.

    Then you would be able to work with those transport requests.

    If you donĀ“t have CTS Projects assigned change in SE03 the Project

    Assignment as not mandatory, just for a short period. Then you should

    able to work with the old transport request.

    In case they are already released and imported in test system I think

    you can not include these orders to be manage by the solman CHARM

    scenario.

    Hope this helps.

    Cheers

    SH

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi,

      If you use Change Request Management, you should always use Change Request Management means to create transport requests; that is, create transport requests in a change transaction or in the task list.

      Manually registered transport requests can be assigned to a task list only, not to a change transaction. If you use change transactions ,,,,the system does not take into account transport requests that you added manually.

      This note is what you want

      Note 1150426 - Registering transport requests in ChaRM

      Hope it solve ur problem completely.

      Regards

      Prakhar

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.