Background Scheduling

Dear Experts

I need to schedule a job where an executable report needs to run thrice with different variants and frequency should be on daily basis. Pls guide me through this. I am not aware how to add multiple steps in a job. e.g. first step of the job should be the report with 1st variant,second step is the same report with 2nd variant and third step with 3 variant.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 11, 2009 at 08:43 AM

    Hi,

    1. create the three variants for the program

    2. Go to SM36 transaction enter the job name.

    3. click on step button and enter the ABAP program Name and variant 1.

    4. click on the save button.you will see the step one in screen

    5. click on the create button on the same screen and enter second variant and program name.

    6. click on save and again create the third variant same as step 5.

    7. go to start condition and specify the time and click on period button and select daily.

    8. so job will gets schedule for specified time on daily basis.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 11, 2009 at 08:37 AM

    Hello,

    While defining the background job in SM36, just click on STEP button and specify the second variant and save. Same way you can add multiple steps with different variants

    Vikranth

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 11, 2009 at 08:40 AM
    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 11, 2009 at 08:41 AM

    Hi,

    Goto SM36.

    Give Job name

    Goto step, Give report name and first varient.

    Save it. then again click on Create button in step list overview screen and give report name and 2nd varient.

    repeat procedure for third varient. this will create 3 steps in job.

    Then go back on main page. Click on start condition > date and tine >period values---> select daily.

    Regatds,

    Dhanahsree

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.