cancel
Showing results for 
Search instead for 
Did you mean: 

How to configure Reserves Settings in WIP-Result Analysis Key

Former Member
0 Kudos

Hi,

I need to Capitalize the un-realized revenues/Cost?. I came to know that it can be fixed by doing configuration in Result Analysis Key. What are the settings that i need to do in WIP configuraion (Product Costing). Kindy help me or provide me some inputs to full fill this requirement.

Thanks

Kishore

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Use Tcode OKG5 - Assign the required Cost elemnets to a Line ID, under "Req To Cap" coloum.