P.O Item Block status in RR

Former Member
0 Kudos

Dear all,

My scnario is for Source Inspection, I had created P.O for 50 Kg in line item no 10, this line item is relased and Inspection lot created for which Results also recorded. After 1 month iam blocking the line item no 10 & raising P.O for another 25 Kg for the same material in line item 20. For this also Inspection lot created and Results recorded.

My req is if the P.O line item is blocked, the system should not allow to make Results recording for the blocked P.O. But in standard eventhough P.O item is blocked , system allows to make RR Any validation is possible to overcome this problem.

with regards,

K.Lokesh.

Accepted Solutions (1)

Accepted Solutions (1)

former_member186399
Active Contributor
0 Kudos

Dear Lokesh

You can use the BADI : QE_SAVE for the same

Regards

Gajesh

Answers (1)

Answers (1)

Former Member
0 Kudos

hi

Please check folllowing user exit

QEEM0011 User exit: add. functions before valuating insp. characs

QEEM0015 User exit: add. functions after entering individual results

logic will be when status of PO line item is block then it should give msg during RR.

Regards'

Sujit