on 10-24-2018 2:23 PM
Hello,
I have a inspection type QM for the PP order for MVT 101.
But when i run an IW8W,so MVT 101 too, i have a inspection lot created. i don't want this inspection lot for my PM flow.
How can i make the difference beween PM and PP order on this inspection lot generated ?
Thanks for your help
Serge
You have to use a user exit at the time of lot creation to suppress the creation of the lot by having the exit (EXIT_SAPLQPL1_00 )
look at the order type and setting the flag null on the exported parameter (QM00-QKZ) when you don't want the lot created.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Craig,
I agree with you, i didn't find a standard solution on it.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.