cancel
Showing results for 
Search instead for 
Did you mean: 

QM inspection lot for PP order but not in IW8W

former_member220454
Participant
0 Kudos

Hello,

I have a inspection type QM for the PP order for MVT 101.

But when i run an IW8W,so MVT 101 too, i have a inspection lot created. i don't want this inspection lot for my PM flow.

How can i make the difference beween PM and PP order on this inspection lot generated ?

Thanks for your help

Serge

Accepted Solutions (1)

Accepted Solutions (1)

former_member42743
Active Contributor
0 Kudos

You have to use a user exit at the time of lot creation to suppress the creation of the lot by having the exit (EXIT_SAPLQPL1_00 )

look at the order type and setting the flag null on the exported parameter (QM00-QKZ) when you don't want the lot created.

Answers (1)

Answers (1)

former_member220454
Participant

Thanks Craig,

I agree with you, i didn't find a standard solution on it.