Problem in usage decision if posting to Return delivery

Former Member
0 Kudos

Hello

when we are doing GR against outline agreemnet for example 5 quantity(5 seperate line item during MIGO) automatic inspection lot is getting created(only one inspection lot is created for quantity).

Now the problem is while doing Usage decision through QA11 if for example 2 quantiy is posted to return delivery and 3 to unrestricted use the system is giving error message "2.00 PCE incorrect Deficit of PU GR quantity 1.00 PCE".

The reason for that is

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

ok

Former Member
0 Kudos

Hi

can you not use one inspection lot per line item.

check the setting in Inspection type.

This will create multiple inspection lot with reference to multiple line items.

I hope this will add some value

Regards'

Sujit

Former Member
0 Kudos

cont....

The reason for that is the GR document has 5 seperate line items with 1 quantity each so the posting to Return delivery is 2 quantity,

so please advice any setting in configuration required to allow the QA11 with more then 1 quantity to "return delivery" even though the GR docuemnt has line items with 1 quantity each.

Thanks for your reply.

Regards

Santosh

Former Member
0 Kudos

Hi,

Reason for this error is because Lot is created for only 1st line Item for 1Qty so U can post only Maximum Qty1,

If QM settings are done for all 5 line items it creats 5 different insp lots line item wise.

jay

Former Member
0 Kudos

Hello Jayashankar/sujit

In existing set up,eventhough the GR is done in seperate 5 line items with 1 quantity each only one inspection lot is created with 5 quantity.

We have already suggest for one inspection lot for one line item in GR but our client does not want to change the process.

So kindly suggest whether any setting in spro to make this possible.

Thanks for your reply.

Regards

Santosh

Former Member
0 Kudos

Try to post UD for 5 times (QA11 and then QA12)...3 times posting into Un-Restricted Stock and 2 times into Return Delivery because for each of GR Line Item Material Document has been created separately.

Best Regards,

K. Raghavendra Nayak