cancel
Showing results for 
Search instead for 
Did you mean: 

Packing through RF

ramesh_racherla
Participant
0 Kudos

Hi Experts,

Packing Through RF.

Creating a Shipping HU and Repack Hu Manually through RF is fine.

In 'Repack HU Item manually" is there any way to pack partial Quantity of Source HU to new/existing HU ?

I can pack Full Quantity of a HU to a New/Existing HU but not partial.

But we can perform above from Terminal through /SCWM/Pack with Repack Product Option. Is there anything similar in RF.

EXP: Suppose we have 24 EA in a HU. I want to Pack 12 EA of that to a new/existing HU? Is this possible through RF? if yes then How

Kindly suggest.

Regards

RameshR

Accepted Solutions (0)

Answers (1)

Answers (1)

sushant_wanjari
Contributor
0 Kudos

Hi,

It is possible in standard SAP. On the Repack HU item manually you need to select the item in the HU and then apply exception SPLT. Thereafter click on the button for NEW HU and specify the packaging material and the bin (where original HU is present).

System will reduce the quantity of original HU and would create a new HU for the repack quantity.

-Sushant