Transfer control strange behavior

Former Member
0 Kudos

Dear all,

I am very new in SAP and on this forum so I hope I am posting my problem in the correct way

I am experiencing a very strange issue with the transfer control

Our costing variant is currently customized without any transfer control

We would like to implement a transfer control which should transfer the current standard prices (if calculated in the last 12 months).

Item A is made of items A1 and A2 + subcontracting fee

Items A, A1 and A2 all have a current standard price, calculated with our current set-up (without transfer control), since less than 12 months.

When recosting item A with transfer control I get the strange following result :

In the display of the new cost estimate of item A, items A1 and A2 get the current standard price of item A ! Looks like the system transferred the cost estimate of top item A to the components, instead of the cost estimate of these components

Any idea why and how to solve this ?

Thanks !

Accepted Solutions (0)

Answers (1)

Answers (1)

rajneesh_saxena
Active Contributor
0 Kudos

Hi

Interesting.

Can you please paste screen shots of your costing of A/A1/A2. And also of transfer control.

Rajneesh