on 10-25-2018 9:52 AM
Dear All,
My requrement is as follows.
Material Code ABC - Stapler Pins (5000)
Current base unit is EA – each
Alt. u/m is PC – Pieces
Conversion is 5000 PC = 1 EA
This material assign to material BOM and 50 base unit 20 component qty.
If we issue production qty 225, Component qty 90 calculated based on the conversion.
But we need it calculate as qty 100. Because of 20 pieces use for every 50 base qty.
Hi
90pcs calculated is correct quantity. Maybe your figure 100 pcs contains component scrap you need to set up in BOM.
Otherwise as Amit and Kumar pointed out you could set it up as production version with lot size configured to your needs.
Regars
Tomasz
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
1. Enter the correct conversion in material master.
2. System is behaving as per design of calculating the component quantity i.e Req qty/ Base qty * Saved component qty.
3. If it is process industry , you can use functionality of MQC and create a formula to calculate the component quantity against product quantity
https://archive.sap.com/discussions/thread/3819450
4. Change the quantity in production order
Regards,
Amit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
101 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.