Skip to Content

SAP PI Dual Stack: Configure Specific Interface Message Retention

Hello,

From notes 1960448 and this link:

https://help.sap.com/saphelp_nw73ehp1/helpdata/en/66/ca97663c22403cb111a28cc88027d9/frameset.htm

It is said that we can set the retention period for specific interface. But when I go to the SOA > Monitoring menu, there's no "Message Retention" option. Is it because the PI version is below 7.5 sp07? Or is it because this feature is only available for single stack PI?

Another question is that, will the retention period configure there will affect the retention period in ABAP stack for Dual Stack PI system?


Thank you.


Regards.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Oct 23, 2018 at 01:07 PM

    Hi Suwandi!

    Did you check wheither your PI system meets the requirement mentioned in above note:

    The function is available since SAP NetWeaver Process Integration 7.31 SP12 and 7.40 SP07

    Regards, Evgeniy.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.