Hi all,
There is some inconsistency in the PS reports.Actual overall is coming in the S_ALR_*87013558 at the network level.But it is not summing up at the WBS level i.e cost at network i s 50000 INR ,but at corresponding WBS,it is coming up as 0 INR.What could be the reason behind this?