cancel
Showing results for 
Search instead for 
Did you mean: 

MM month closing

Former Member
0 Kudos

Dear Experts,

Today 1 Nov 2009, one support employee close MM period (by t-code mmpv). and then current period is 11 2009 and previous period is 10 2009. but i again close 11 2009 and open 12 2009 mistakenly ( i thought system will not accept). Now current period is 12 2009 and previous period is 11 2009.

Now, i need to back to the first state that is current period is 11 2009 and previous period is 10 2009 -- which is correct.

Please help me to do this.

Thank you.

Best regards,

Zusen

Accepted Solutions (1)

Accepted Solutions (1)

adwait_bachuwar
Active Contributor
0 Kudos

Hi,

this has been posted in many threads and in previous replies.

MM period once opened cannot be reversed. if you are on live system then please follow the SAP note 48738.

regards,

Adwait Bachuwar

Former Member
0 Kudos

Thank you Adwait Bachuwar for your reply.

i read the note 48738 but i don't understand the following ..

If you already need this additional security beforehand, implement the

attached correction instructions and create SET/GET parameter

MMPI_READ_NOTE.The SET/GET parameter belongs to development class MG and

should have the following short text:

'Follow the instructions in Note 487381 before initialization '.

In addition, change message MM(016):

'Follow the instructions in Note 487381 before initialization'.

my system is not getting the parameter MMPI_READ_NOTE

how can i create the parameter, Please help.

Thank you.

Kind regards,

Zusen

Former Member
0 Kudos

Hi,

Please put the parameter MMPI_READ_NOTE in the User profile, parameters tab with the parameter value as the current date with the format YEARMMDD with no slashes, spaces in between , save the user profile and then initialize the periods in MMPI transaction.

This must work.

Regards,

Sasi Kanth J

Former Member
0 Kudos

Hi

After assigning the parameter MMPI_READ_NOTE when i tried to execute MMPI following error comes

Follow the instructions in Note 487381 before initialization

Message no. MM016

Diagnosis

You want to run the period initialization program. Note that when you start the period closing with initialization, inconsistencies can arise.

Procedure

Note 487381 describes the possible data inconsistencies that can occur if you perform initialization in a productive system. The inconsistencies cannot be traced back to a system error, but instead the period closing with initialization. Therefore, these inconsistencies can only be cleared by using the chargeable remote consulting service. This is because in releases higher than SAP R/3 4.5, the period closer does not normally have to be started with initialization.

Please help

Thanks and regards,

Zusen

Former Member
0 Kudos

Hi,

In the Parameter ID - Pls. put MMPI_READ_NOTE

In the parameter value - Pls. put (if you are doing today) 20091112 and save the user profile.

Then go to MMPI, initialize the required period.

Please check & confirm.

Sasi Kanth J

murugan_mgl
Active Contributor
0 Kudos

HI,

If it is really a production server,Dont take the risk.Raise a OSS notes to SAPThey will help u.

Answers (9)

Answers (9)

Former Member
0 Kudos

done

Former Member
0 Kudos

Dear Badruddoza Zusen,

You may Initializing the MM Periods via t/code MMPI. Once this done please confirm this posting periods via t/code MMRV. For more understanding please refer to SAP note 48738. Hope this help your queries. TQ

rgds,

nema

Former Member
0 Kudos

Dear Badruddoza Zusen,

You may Initializing the MM Periods via t/code MMPI. Once this done please confirm this posting periods via t/code MMRV. For more understanding please refer to SAP note 48738. Hope this help your queries. TQ

rgds,

nema

Former Member
0 Kudos

Hai,

In a production system if you have posted the period wrongly that is extremely difficult to revert,we need to reverse all the postings done by means of some z program you need to remove the plantt from assignement to company code and then reverse the period then once agin assign the plant to company code,But it is that easy to do that,only thing you cna do is your current period will become previous and you need allow postings for the previous period in the system

Regards

Former Member
0 Kudos

sorry use MMRV t- code

Former Member
0 Kudos

Hi,

plz use t-code PPRV to work on previous period i e u r 11 month. try this.

Former Member
0 Kudos

Mark the check box 'Allow posting in prev period'.

Former Member
0 Kudos

Hi Badruddoza,

Try Tcode MMPI, - For Intialising the MM Periods ( Not in usage, Only used in case of emergency period changes)

Regards,

Vraj

Former Member
0 Kudos

Once MM posting period is closed. It is not possible to reopen

Former Member
0 Kudos

Thank you for your reply.

There is no way?

Now it is month of first November. Should SAP accept to close month of November w/o any message at least.

Former Member
0 Kudos

If you are following the Jan to december (jan =1 and Dec =12) for MM postings , then your first posting tells that the November period is already closed. system will not allow you to close November again