Skip to Content
0
Oct 31, 2009 at 11:37 AM

INSPECTION LOT CREATION

31 Views

our some raw material have 2 source of supply and is outside purchase and other captive supply from our mines.

we are using a single material code for taking Gr of this material, for outside purchase GR is done against PO given tio vensor and for captive GR done againt internal PO create.

now for quality parameter there is difference in there specfication.

so we have maintain 2 inspection plan A and Plan B for captive and outside purchase respectively.

now we want when we done GR for captive material than Plan A should be used for Inspection Lot creation

and for outside purchase material Plan B to be used for insp lot creation.

plz advice how to map it