Post Cost directly in an order

Former Member
0 Kudos

Hi all,

I would like to post actual costs directly in an order. The calculation are complex and calculated on a spreadsheet and I just want to post the final value in the order.

Any ideas welcome.

thanks

Accepted Solutions (1)

Accepted Solutions (1)

former_member190819
Participant
0 Kudos

Hi,

Check with FI person T-code FB01.

This should solve ur problem.

Thanks,

Rahul

Answers (5)

Answers (5)

former_member190819
Participant
0 Kudos

HI,

When you need to direct posting to Maintenance order

You can refer following procedure

TC FB01

Document date: - choose

Document Type: - AB Accounting document.

Company code and currency/ rate: - your configured one

Posting key:- 40 GL:- Orders Settlement - Maintenance Order

Amount:-your desired cost

Order: - desired Maintenance Order.

Next Line item

Posting key :-50 GL :-(consult FI and use proper GL)

Then post the document

You will see the (your desired amount appeared in costing tab of Maintenance Order)

Caution this operation should be carried out under observation of FI-CO person

Please revert back if you have any doubts.

Thanks,

Rahul

Former Member
0 Kudos

Tefo,

If you want to post costs directly to an order you are circumventing all the processing done in work orders.

Have you checked out costing sheets in orders for your calculations (IMG:Costing Data for Maintenance and Service Orders>Maintain Costing Sheet?

P745394
Active Contributor
0 Kudos

Hi

You can create a new activity type with the unit of your currency & In Maintenance Order by using this activity type calculated actual cost can be confirmed.

Another way is to directly post the actual cost to Order by using GL account.

Regards,

Former Member
0 Kudos

Thanks all.

If I post directly from GL, can I see these in the cost reports in PM.

Rgds

Former Member
0 Kudos

Thanks all.

If I post directly from GL, can I see these in the cost reports in PM.

Rgds

peter_atkin
Active Contributor
0 Kudos

Yes, this can be done.

I would strongly suggest you talk to your FICO team

PeteA

Former Member
0 Kudos

How do you use historical orders to achieve this?

Pete I asked them and did not have an answer. What should they consider using??

peter_atkin
Active Contributor
0 Kudos

You can't post costs to historical orders.

PeteA

Former Member
0 Kudos

Hi,

You should be able to enter "Actual Cost" per value category on the cost tab of the Historical order. At the header level, you could enter the estimated costs of the order as well.

If you would like to use a normal order and not historical order, you could enhance the header data and include a custom field to capture the the value of Actual costs.

Regards

Narasimhan

former_member187991
Active Contributor
0 Kudos

hi

you can consider historical order to directly post the cost into the order.

i think it is the available option

regards

thyagarajan