on 10-30-2009 9:01 AM
Hi all,
i have a problem in fixed lot size.
1) in material master record i define
- LOT SIZE= FX FIxed order quantity
- FIXED LOT SIZE= 150
2) in customizing OMI4
FX is defined as :
- lot-sizing procedure S
- lot-size indicator F
- lot size SOP: 2
But when MRP runs, the purchase requisitions of this material are generated for the real requirement quantity (for instance 62 PCs) instead of 150 PCs as defined in FIXED LOT SIZE.
What can i do to solve my problem?
I have also substituted LOT SIZE SOP: from 2 to " "Lot-for-lot order quantity. But the result is the same.
Thanks in advance.
Alba
Hi Alba,
Please check if in OMI4 the indicator "Last Lot Exact" is checked for the FX lot size key (or the one that you are using).
If it is, this may be the reason for the behaviour that you describe.
Regards,
Mario
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
u may use monthly lot size ie MB or HB u see it what this. and maintains required fields.
Thanking you
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Are you using APO for planning?
Thanks/Karthik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Alba,
1) after making setting Lot Size: SOP as Lot-for-lot order quantity. save this setting
2) Run MRP in MD02with processing as NETCH
4) make Planning mode parameter as 3 ( Delete & Re-create planning data )
Then check the result
Regards
kumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.