I am trying to configure SAP GRC Process control 3.0 with Enterprise Portal. The JCo connection is successfully established. However when trying to preview the iViews I am getting below mentioned error. Not able to figure out the ABAP error as below. Can anybody help me with this regard. The SAP GRC Process control is hosted on a virtual machine and SAP ERP is as well hosted on the same machine. Has the below error got to do with SAP GRC PC hosted on same server as SAP ECC 6.0 EHP4.
I am facing with two error messages:
1. Problems with RAS Connection
2. The termination type was RABAX_STATE . The error occured in the application server and in the work process 1. Pls provide help with the above error messages.
Is this issue with the server, backend ABAPstack. Why is there a problem with the RAS Connection.Is thisbecause the software is hosted on virtual machine.
Pls replyASAP.