Hi Gurus,

I am having issue in overhead calculation, i assigned cost sheet in Planned order, ex 1000 Al Rs 374.00 .i run ck11n for 1000000 AL . so in system taken for calculation 0.37 for production of 1000000 Al ,

for above calculation i have created overhead rate for different activity assigned to cost sheet, tel me where it was wrong config

Regards

Vinu.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

In overhead did u maintained quantity base overhead for example 100 qty Rs.100. In cost sheet in overhead tab u have to specify the rate.

Regards,

Sreekanth Munipally

Former Member
0 Kudos

Hi Sreekanth Munipally,

Thanks for quick replay,

Yas i maintained quantity base overhead in overhead tab in Cost sheet

exp..Valid from date, to date, co area, overhead type 2(plan), plant (R015), overhead rate (374.65.INR) per 1000 AL

Reagards

Vinu