Skip to Content
author's profile photo Former Member
Former Member

Transport Error

Hi,

While transporting BI DEv to bi prod we are getting this error. kindly help me to solve this error

Start of the after-import method RS_ISTS_AFTER_IMPORT for object type(s) ISTS (Activation Mode)

Start of the after-import method RS_AREA_AFTER_IMPORT for object type(s) AREA (Delete Mode

Errors occurred during post-handling RS_AFTER_IMPORT for UPDR L

RS_AFTER_IMPORT belongs to package RS

The errors affect the following components:

BW-WHM (Warehouse Management)

kvl

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on Oct 29, 2009 at 06:43 PM

    this is for your BW/BI functional to sort out. this is not a BASIS problem.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 11, 2015 at 09:35 AM

    Dear kvl,

    what was the solution to your issue?

    Thank you for sharing!

    Tabea

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.