Dear all,

i am copying BOM from one plant to another plant

i have so many levels in BOM & even Alternative BOM'S

Now only Alt - 1 BOM is only getting copied

when i am trying for Alt- 2 from copy function

Then system is defaultly taking same Creating plant in the pop-up of Copy from

and interesting thing is it is greyed out & i cannot edit it

Query is how to Copy Alt - 2 BOM

Regards

kumar

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Dear all,

Can any one check this & Reply

Your help will be highly Appreciated

Regards

kumar

Former Member
0 Kudos

Dear Vivek, Brahmankar, Mangalraj, Prasobh, Dhaval, SmanS, Ritesh, Ratan, BramhaJi & all experts

i have copied one BOM which is having 2 Aiternatives ( From plant 1 to Plant 2)

Now this is creating so much Problem for me

if i delete components in one plant 1 it is getting deleted in plant 2 also ( Vice- Versa)

i dont won't this

and i am getting Mssg as

BOM is Allocated to other plants

How to get rid of above

Plz throw some light

Regards

kumar

Former Member
0 Kudos

Thanks to All,

As this thread has become so long

i raised other thread with same query

Plz Help me to solve this query

Regards

kumar

Edited by: kumar kumar on Oct 29, 2009 8:08 AM

dhaval_choksi3
Active Contributor
0 Kudos

Dear Kumar,

I have not gone through the whole thread, but as per your last post I can assume that BOM is created in second plant using T.Code CS07 (copy plant assignment) that 's why this difficult situation arrives.In 1 or 2 occasion I had also face the same situation.And as a result I decide not to use or suggest use of this CS07.I don't the know reason or I can say not tried to figure out why this happens.But as of now I can say this is happen due to same BOM group in both plants.

Now do one thing, in plant first create new BOM using CS01 by copying existing BOM.Then delete earlier BOM.Then check it by editing the BOM of same material in alternate plant.

Regards,

Dhaval

Former Member
0 Kudos

Dear Dhaval,

Thanks very much for ur reply

let me check & get back to You

Plz find my new thread with same query & Reply on that

Once again Thanks

Regards

kumar

former_member199502
Active Contributor
0 Kudos

Hi Kumar,

Hope you are fine,

I went throgh all the replies and ur queries and try to simulate the same in mys system.I tried to copy a BOM in CS07 having 2 alternative BOM(XYZ plant ) to another plant(ABC).The production storage location in this BOM component was assigned and extended in this plant but for the plant(ABC) which i am going to copy there was no storage location.

I did successfully and checked in the plant(ABC) for teh same BOM component,storage location was not assigned,when i tried to assign forcibly the same storage location of plant XYZ,it gave me warning message (Message no 29362,storage locatrion not supported for the materil in plant ABC)

From this i can conclude 2 plants shouldnot have storage location code same and same storage loctaions should not be assigned for teh material under 2 plants.

For your BOM is Allocated to other plantsproblem,

This is a std SAP message as you allocated the BOM to 2 different plants.thsi functionality is usefull where commom BOM will be there for different plant and buisness want to control this in a single point.These related BOMs are identified by a common internal BOM number in the standard SAP system

If dont want to have this functionality better you create a BOMs for another plant either by BDC or LSMW having the same data of the existing plant.

Hope it helps

Former Member
0 Kudos

Thanks Girish,

For ur reply

Regards

kumar

Ritz
Active Contributor
0 Kudos

sorry kumar,

havent got time to help you properly as well as in time.

regards

Ritesh

Former Member
0 Kudos

Fine Ritesh,

No issues, Problem has been solved

anyways Thanks for ur reply

All The Best For You & All Forum Members

Regards

kumar

Answers (2)

Answers (2)

rammohan_shenoy
Active Contributor
0 Kudos

*Kumar,*

*Copying 1 BOM from 1 plant to another plant can be done in Tcode : CS01 itself.*

*The reason for your issue "system is defaultly taking same Creating plant in the pop-up of Copy from+*

**and interesting thing is it is greyed out & i cannot edit it"

might have been that the Header material was not extended from plant1 to plant 2.**

*The changes made in BOM at plant 2 will have no effect on BOM in plant 1 or vice versa.*

*They are different plants so master data for each will be differrent.*

Hope this answers your question

*Thanks,*

*Ram*

Former Member
0 Kudos

Dear All,

Thanks Very much ur response

Now i have Copied one BOM which is having 2 Alts From plant 1 to plant 2

both ALts are copied to plant 2

Now the problem is issue storage location in BOM

if i change storage location in Plant 2, then same stoarge location is also storing in Plant1 ( which is not required & wrong)

where is setting in SPRO to break this relationship

Regards

kumar

Anupam1143
Active Contributor
0 Kudos

HI

If the same issue storage location exists in the both plants then system will allow to copy, but if the in plant 2 that issue location doesnt exist then system should gives error.

Plz correct me if i am wrong

Regards

Anupam Sharma

Former Member
0 Kudos

Dear Anupam & All

Thanks for ur reply

Now the issue storage location should be different in Both the plants

But system will taking as same in both the plants

How to break this

Plz throw Some Light

Regards

kumar

Former Member
0 Kudos

Hi,

Are you copying from CS07.

Regards,

Vishal

Former Member
0 Kudos

Dear VS,

First of all Thanks for ur reply

i am copying from CS01

Regards

kumar

Former Member
0 Kudos

Hi,

if you want to assign BOm in another plant why dont you use CS07

Regards,

Vishal

Former Member
0 Kudos

Dear VS,

Once again thanks for ur reply

Can u let me know step by step

How to Go with CS07

i never used it, more over will it fullfil my requirement

Regards

kumar

Former Member
0 Kudos

Hi,

Enter material

existing plant of BOM

Atlernative number

Assign plant --- Enter plant in which you want to copy it.

Inside click the bOM and save

Regards,

Vishal

Former Member
0 Kudos

Dear VS,

Inside click the bOM and save

Can u elaborate it, have yoy used this function before

let me give a try in development & if it works fine then will do in PRD server

Regards

kumar

Former Member
0 Kudos

Dear VS & All,

Here i have to change the Production storage location in BOM while copying

it is possible Via CS01

But is it possible in CS07 also

Regards

kumar

Ritz
Active Contributor
0 Kudos

Hi Kumar,

first just go through , below link .

http://help.sap.com/saphelp_erp2005/helpdata/EN/a0/1016bd4c8311d189520000e829fbbd/frameset.htm

CS07 is for allcation to other plant.

changing production storage location you can do as next step through mass change of BOM's

"If a bill of material is assigned to several plants, an asterix (*) is displayed in the place of the plant. If it is, there is only one BOM for all plants. Any change you make in one plant is valid in all of the other plants, too."

check below link for allcation to plants.

http://help.sap.com/saphelp_erp2005/helpdata/EN/a0/1016bd4c8311d189520000e829fbbd/frameset.htm

and i hope it will help you.

check out and revert back.

regards

Ritesh

Former Member
0 Kudos

Dear Ritesh,

Thanks for ur inputs

Just let me know which one is best

CS01 or CS07 ( for copying )

Coming to Mass changes can u plz update on it a bit more

Thanks once again.

Hoping a positive response From you

Regards

kumar

Former Member
0 Kudos

Dear All,

My Requirement is

1) in plant 1- i mainatin different storage locations in BOM ( these storage locations are only in this plant)

2) in plant 2- i mainatin different storage locations in BOM ( these storage locations are only in this plant)

so as per above storage locations are totally different in both plants

more over i change data in BOM in one plant, then other plant should not get effected

How to Achive the above & what will be the easy way

Plant 1 have all BOM'S & some of BOM'S from plant 1 should be copied to Plant 2

Hoping a positive response from all of You

Regards

kumar

Former Member
0 Kudos

Hi Kumar,

Pl. let me know, where we have to enter storage location.

For me without any problem, alt. 2 BOM has copied.

Madhava

Former Member
0 Kudos

Dear Madhava,

How you copied

Via CS01 ??

Regards

kumar

Ritz
Active Contributor
0 Kudos

Kumar,

for coping BOM to another plant using CS07 its same as how we extend material to other plant.

first create all materials in other plant.

create all BOMs in first plant as well as there alternative.

then use CS07 , input all the BOMs you want to copy in second plant in it with plant and alternative details.

before saving press , consitance check.

save it

if there is any inconsistance , you can check details in log.

if , the storage location field is creating inconsistance, remove it from first plant and update it while updating the storage location using mass changes.

check and revert back.

regards

Ritesh

Former Member
0 Kudos

Dear Ritesh,

Once again thanks for ur reply

Now, everything is availble in plant 1just i need to copy from plant 1 to plant 2

But here the changes made in plant2 BOM should not effect Plant 1 BOM ( Visversa )

Hope You got it & Plz elaborate abt mass Changes

Plz reply on this

Regards

kumar

Ritz
Active Contributor
0 Kudos

Kumar ,

if you can wait , i will do it soon.

mean while , check the SAP help.

http://help.sap.com/saphelp_erp2005/helpdata/EN/a0/1016bd4c8311d189520000e829fbbd/frameset.htm

its not much difficult.

for exact details of steps , pls give me some time.

Sorry, but need to finish few things first.

Regards

Ritesh

Former Member
0 Kudos

Dear Ritesh,

Fine will wait, but let me know ur detailed reply step by step

by which i can go with easy way for Copying BOM with alternatives

Regards

kumar

Ritz
Active Contributor
0 Kudos

Ok mean while search for mass updates to BOM in forum,

you will suerly get the relkated one which can help you out for time being.

also check CEWB

Ritesh

Former Member
0 Kudos

Dear Kumar,

Can you please tell me for what you need steps ?

Regards,

Vishal

Former Member
0 Kudos

Hi Kumar,

w.r.t your first trail of this thread, I answered saying that, you can copy by using CS01.

This is regular copying. I think you know it.

When you press copy icon, it asks for material, plant and alt.no. Just you have to enter and it will display the BOM f.rom where you have to copy. Select all and press copy icon again. Save it.

Madhava