Want to create inspection lots during In-House production (shop floor)

Former Member
0 Kudos

Hello,

As per our requirement we need to inspect a material multiple times (3-4 times) during shop floor production. It means we want to check a material say after operation 30, 50, 70 and 110 (of routing). We don't want to start operation 50 unless inspection of material after operation 30 is over. We don't want to start operation 70 unless inspection of material after operation 50 is over and so on.

How can we attain this? We have assigned inspection type 03 in material master - quality management. We have assigned various MICs in concerned operations. Inspection lot is getting generated as soon as the release of production order takes place and it contains all MICs (and operations). We are able to make the result recording and defect recording for all operations at the beginning only.

Is it possible to create multiple inspection lots for these operations and is it [possible to restrict the confirmation of later operation unless inspection of previous operation is over i.e. a usage decision is already carried out for previous operation.

Puneet

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Problem Solved

Former Member
0 Kudos

hi puneet,

can u please let me know what miracle u didi to resolve this issue?

Thanks

raghav