Skip to Content

Can i have a combination of picking strategy of F and M

We have a requirement as below

All the partial pallets are stored in s type PPA and full pallets are put in HBB.

Now the business requirement is as when a TO is created first the pallets should be first picked from PPA and then HBB.This can be achieved by picking strategy M(by mentioning the large and small qty in material master)

But the sequence of pallets again has to be picked based on fifo picking strategy as this material is batch managed.

Please assist if there is an option that i can combine both Fifo(F)and large and small quantity (M)

I can think about selecting the checkbox of userexit in storage type but not sure if this option might work

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.