Skip to Content
author's profile photo Former Member
Former Member

availability check

Hi

In SPRO, how to configure the availability check .please provide me path.

Thanks in advance

Add comment
10|10000 characters needed characters exceeded

4 Answers

  • Best Answer
    Posted on Oct 21, 2009 at 12:23 PM

    Hi,

    The path is SPRO-> Materials management ->Inventory management and Physical inventory ->Goods issue/transfer postings-> set-up dynamic avaialbitlity check.

    From SD side the path is SPRO-> Sales and distribution ->basic functions ->Availability check and transfer of requirements.

    From MRP point of view, the path is SPRO->Production->Material requirement planning ->Procurement proposal->Planned orders->Define availability check for components and Carry out collective avaialbility check.

    Regards

    Add comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 21, 2009 at 12:17 PM

    In Inventory Management, two types of availability check are carried out.

    o availability check during the entry of reservations

    o availability check during the entry of goods movements The system checks whether the material

    to be withdrawn is available and issues a message, if necessary. Note the availability check is only carried out

    if: o the material master record contains a checking group for the availability check (MRP data)

    o a checking rule is assigned to the transaction in Customizing You can define

    o for each movement type which type of message is issued (object Movement type)

    o which checking rules are supported (object Checking rule)

    o per checking group and checking rule: which objects (documents, stocks,

    material requirements) are included in the availability check (object Define checking rule)

    o per transaction of Inventory Management: which checking rule applies (object Transaction codes) Default Settings

    o In the standard system, the message type A (warning in the case of non-availability, otherwise no message) is set

    for all relevant movement types.

    o For Inventory Management, the checking rule 03 is provided. Recommendation SAP recommends that you accept the settings

    defined in the standard system. In this case, no action is required on your part. The checking rules are also used by

    other applications (Sales & Distribution) and can also be maintained by them. If you want to define new checking rules

    or change existing rules, SAP recommends that you contact the other applications (Sales & Distribution, Material Requir

    ements Planning).

    Activities 1. Define the movement types for which an availability check is to be carried out and which type of message is issued.

    2. Check the checking rule that you want to use in Inventory Management. Define a new checking rule, if necessary,

    and define for each checking group which objects are included in the availability check for this checking rule.

    Check the availability checking rules for each transaction.

    Assign other checking rules to the transactions, if necessary.

    Check

    check the links...

    http://help.sap.com/erp2005_ehp_04/helpdata/EN/a5/63380f43a211d189410000e829fbbd/frameset.htm

    http://help.sap.com/erp2005_ehp_04/helpdata/EN/a5/63380f43a211d189410000e829fbbd/content.htm

    Add comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 21, 2009 at 12:23 PM

    Dear,

    Spro-Production-Sales & Operations Planning (SOP)-Master Data-Assignment of Validation Rules to Key Figures-Maintain Checking Groups for Availability Check

    Regards

    Utsav

    Add comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 21, 2009 at 12:33 PM

    Dear GP,

    Availbility Check

    1) From SD precpective AV check will performed for sales order, t-code is OVZ9

    2) From PP precpative AV check will be performed or Production order, t-code OPJJ

    3) From MM point of View, i think Experts have already Suggested

    Regards

    kumar

    Edited by: kumar kumar on Oct 21, 2009 2:35 PM

    Add comment
    10|10000 characters needed characters exceeded